TSO & EPC PROJECTS: CEE

High Voltage
Transmission Steel.

Procurement coordination for lattice towers and substation steelwork, including 110-400 kV project requirements. Confirm operator specifications, dimensional checks and trial assembly scope with the selected fabricator.

Hole TolerancePer Drawing
IdentificationPer Brief
Power structuresPOWER-01

Lattice tower

Elevation and node detail

A braced tower with cross arms and an enlarged bolted node. The drawing shows member relationships, not electrical clearances.

  • 1 · Lattice bracing
  • 2 · Cross arm
  • 3 · Bolted gusset connection
  • B · Tower base width

Concept illustration. Not for fabrication. Dimensions and connections require project-specific design.

Lattice tower

A braced tower with cross arms and an enlarged bolted node. The drawing shows member relationships, not electrical clearances.

  • 1 · Lattice bracing
  • 2 · Cross arm
  • 3 · Bolted gusset connection
  • B · Tower base width

Illustrative geometry. Dimensions, connections and member sizes require project-specific engineering.

Scope of Execution

From Distribution to Substations.

Define tower, portal and equipment-support packages in the RFQ. The selected fabricator confirms manufacturing scope and interfaces against operator and EPC requirements.

Lattice Towers (110-400kV)

L-profile lattice towers for suspension, tension and angle locations. Tower families, loads and drilling details are defined by the operator specification and project design.

Main Transmission

Substations and Portals

Load-bearing structures within switchgear installations. Includes heavy portals for conductor support and high-precision gantry structures.

Substations

Equipment Stands

Standardized steel pedestals for current/voltage transformers and disconnectors, tailored to the specifications of leading EU operators.

Equipment & Devices

Tubular Poles (Urban & Rural)

Polygonal tubular poles may be considered where lattice-tower footprints are constrained. Voltage level, clearances, foundations and fabrication feasibility require project-specific review.

Low-Footprint Design

PLS-CADD & PLS-POLE Data.

Geometry and drawing outputs from PLS-CADD / TOWER must be checked against approved revisions and the selected fabricator's file requirements. Data transfer does not replace dimensional inspection.

  • ✓ Hole-pattern checks against approved drawings
  • ✓ Trial assembly and acceptance criteria agreed per project
  • ✓ CNC compatibility confirmed with the selected fabricator
Cross arm1 · Cross-arm bracing. 2 · Suspension attachment. 3 · Insulator assembly. a · Cross-arm projection. Concept illustration. Not for fabrication. Dimensions and connections require project-specific design.a123
Cross arm · Connection elevation
  • 1 · Cross-arm bracing
  • 2 · Suspension attachment
  • 3 · Insulator assembly
  • a · Cross-arm projection
Concept illustration. Not for fabrication. Dimensions and connections require project-specific design.

Project Evidence for Grid Procurement.

Request the selected fabricator's certificates, material records and inspection plan for the tender scope. Verify validity and operator-specific approvals before award; Steel-Hub does not claim factory or operator certification.

EN 50341
Overhead Line Design
OPERATOR SPECIFICATION
EN 1090-2
EXC per specification
PER PROJECT
EN 10204
3.1 as specified
TRACEABILITY
ISO 1461
Hot-Dip Galvanizing
COATING INSPECTION
Logistics Command Center

Intersection of CEE Energy Corridors.

For grid projects in Central and Eastern Europe, coordinate scheduled truck call-offs with the selected fabricator and carrier. Loading location, permits and delivery windows are confirmed for the project.

Delivery planning

Example corridors
OriginĐakovoHR
  • ViennaAT
    Road corridor
  • BudapestHU
    Road corridor
  • BucharestRO
    Road corridor

Schematic connections, not a geographic map. Route, permits and delivery windows are agreed for each project.

Planned Truck Dispatch

Per Delivery Schedule

Confirm routes, permits, carrier capacity and transit estimates for each destination. Just-in-time call-offs depend on the approved production programme, site readiness and unloading resources.

Sequence Bundling

Site-Ready Delivery

Agree packing by tower or assembly sequence, component identification and unloading points before dispatch. QR or barcode labels and site handling are specified where suitable; sorting and storage needs must be checked.

Engineering Knowledge Base.

Answers to key questions from TSO operators and EPC contractors.

Knowledge Base

Related procurement guides

EN 1090 EXC3: supplier certificate verification checklist→