Procurement coordination for architecturally exposed steel. Agree the AESS category, visible weld treatment, connection details and sample acceptance with the architect, responsible designer and selected fabricator.

Category SelectionPer Brief
IntumescentAs Specified
Exposed steel detailsAESS-01

Exposed steel node

Elevation and weld study

A branching tubular node with a separate weld-profile study. Visible finish is agreed through project details and a sample where required.

  • 1 · Tubular member
  • 2 · Branch connection
  • 3 · Weld-profile study
  • d · Symbolic member width; finish shown is conceptual

Concept illustration. Not for fabrication. Dimensions and connections require project-specific design.

Exposed steel node

A branching tubular node with a separate weld-profile study. Visible finish is agreed through project details and a sample where required.

  • 1 · Tubular member
  • 2 · Branch connection
  • 3 · Weld-profile study
  • d · Symbolic member width; finish shown is conceptual

Illustrative geometry. Dimensions, connections and member sizes require project-specific engineering.

Scope of Execution

Where engineering meets aesthetics.

For visually exposed structures, define viewing conditions, finish and connection requirements early. The procurement brief records the architect's criteria and the selected fabricator's confirmed scope.

Airports and Terminals

Tree columns and tubular arches for terminal roof structures. Visible weld treatment and surface acceptance are defined by the specified AESS category and approved samples.

Public Transit Hubs

Commercial Atriums (Malls)

Structures for shopping centers and corporate headquarters. Implementation of "hidden bolts" and 'Flush' cover plates for a clean look.

Retail & Headquarters

Pedestrian Bridges

Designer pedestrian walkways and bridges relying on slender, curved steel profiles instead of heavy concrete.

Bridges & Walkways

Parametric Facades and Canopies

Free-form grids, facades and canopies require geometry rationalization. Tube-forming and cutting methods, tolerances and assembly interfaces are confirmed with the selected fabricator.

Complex Geometry & Free-form

Parametric Geometry Coordination.

For free-form work, agree model ownership, geometry checks and fabrication deliverables. Models from tools such as Rhinoceros 3D and Grasshopper must be checked against the selected fabricator's forming, cutting and welding processes.

  • ✓ Curvature rationalization (Planar vs. Double-Curved)
  • ✓ Agreed BIM exchange requirements for Revit and Tekla
  • ✓ Survey and 3D scanning requirements where specified
Concealed splice1 · Access cover, shown displaced. 2 · Internal end plates. 3 · Bolted splice. b · Member width; A–A · End view. Concept illustration. Not for fabrication. Dimensions and connections require project-specific design.b123A–A
Concealed splice · Cutaway and end view
  • 1 · Access cover, shown displaced
  • 2 · Internal end plates
  • 3 · Bolted splice
  • b · Member width; A–A · End view
Concept illustration. Not for fabrication. Dimensions and connections require project-specific design.

Project Evidence for Exposed Steel.

Structural conformity and visual acceptance are separate checks. Request applicable fabrication and coating evidence from the selected fabricator, and approve the required AESS samples and inspection criteria before production.

AESS 1-4
Category as specified
AGREED VISUAL CRITERIA
Sa 2.5
ISO 8501-1 Blasting
AS COATING SPECIFIES
Intumescent
R30 / R60 / R90
SYSTEM VERIFICATION
EN 1090-2
EXC per specification
VERIFY EXECUTION SCOPE
Logistics Command Center

Architectural "White-Glove" Transport.

Protecting finished surfaces requires an agreed packing, lifting and delivery plan for constrained urban sites. Confirm access, handling responsibilities and inspection arrangements before dispatch.

Delivery planning

Example corridors
OriginĐakovoHR
  • LondonUK
    Urban delivery
  • ParisFR
    Urban delivery
  • BerlinDE
    Urban delivery

Schematic connections, not a geographic map. Route, permits and delivery windows are agreed for each project.

Custom Cradles & Padding

Surface Protection

Specify padded cradles, suitable slings and protected lifting interfaces with the fabricator and carrier. Agree packaging checks and inspection at handover, including how any coating damage will be recorded and addressed.

City-Center Logistics

Urban Tight Fits

For urban sites, confirm vehicle access, permits, unloading space and delivery windows with the carrier and site team. Night delivery and just-in-time unloading are options only where approved and scheduled.

Engineering Knowledge Base.

Technical points for architectural and procurement review.

Knowledge Base

Related procurement guides

EN 1090 EXC3: supplier certificate verification checklist→
Direct Line

A question is not a commitment. Ask us anything.

Not ready for a full RFQ? Send a plain question instead — specification, execution class, lead time, a second opinion on a quote you already have. Our team will review your enquiry.

We use your details only to answer this enquiry.